To prepare for a RISQ inspection, work in four stages: confirm the inspection format and get the documents in order, rehearse the demonstrations the inspector may ask for, walk the ship against the areas the questionnaire covers, and be ready to provide a root cause analysis for every finding within fifteen days. RISQ findings rest on objective evidence, and the word of ship staff alone is not sufficient evidence.
This is a ship-side checklist to prepare for a RISQ inspection. For what each section of the questionnaire tests, see What a RightShip RISQ Inspection Actually Tests. For how the inspection fits into the wider picture, see how the ship vetting system works.
Know What You Are Preparing For
RightShip defines a Finding as a failure to meet a requirement. It can arise from physical defects, test failures, incorrect or inadequate documentation and maintenance, a deviation from testing and inspection, or non-compliance with industry good practices and recommendations.
A finding is recorded where objective evidence shows a specified requirement has not been met. The word of the ship’s staff alone is not enough. Crew familiarity with a task, and the ability to demonstrate it, counts as objective evidence. This article follows RISQ 3.2, dated November 2025.
Prepare for a RISQ Inspection, Stage 1: Confirm the Format and Plan the Time
RightShip offers three formats, and which one applies changes how much preparation time goes where:
- Standard: one inspector carries out a comprehensive onboard inspection, expected to take 10 to 12 hours.
- Hybrid: the vessel manager submits all required documentation at least 72 hours before the inspector boards. The questions marked (M) in the RISQ are answered from the documents and those marked (V) during a shorter physical inspection. If the documentation is complete and on time and the vessel is physically prepared, the inspection can be concluded in 8 to 10 hours.
- Dual: two inspectors are assigned and the lead inspector divides the tasks between them. The format is designed to be completed within 6 to 7 hours.
These durations are net inspection time and exclude interruptions such as meal breaks and Port State Control or Flag State inspections. For a hybrid inspection the documents have to be complete and on time, because the (M) questions are answered from them. The vessel manager is also responsible for sending an up-to-date Deck and Engineers Matrix to RightShip before the inspection, and the latest edition of the RISQ should be on board.
Prepare for a RISQ Inspection, Stage 2: Get the Documents Right
The questionnaire asks the inspector to check, among other things:
- Master’s standing orders, with the specific content checked: visibility criteria, minimum CPA thresholds, conditions for calling the Master, and ECDIS display layer requirements for different navigation conditions (question 3.2).
- ECDIS familiarisation records showing that the Master and navigation officers were familiarised with the ECDIS equipment installed on board, with objective evidence (question 2.14).
- The officer matrix, accurate and reflecting the officers and engineers on board (question 2.13), and the crew’s ability to communicate effectively in the working language of the ship (question 2.3).
- Rest hour records in ILO format, with compliance levels reported to the manager at least monthly. The guide to question 2.5 says to record a Finding for two or more consecutive violations by any seafarer in a 30-day period, for no monthly report to the vessel’s manager, or for records not in ILO format.
- Electronic certificates. The inspector may ask the Master to demonstrate their validity using the instructions available on board, and records a Finding if the Master cannot. RightShip recommends giving the inspector temporary access to the online certificate system at least two days before the inspection.
- Audit and superintendent inspection reports with corrective action (question 4.3), enclosed space entry records (4.5), hot work procedures (4.7), the schedule of drills and exercises (4.9), portable gas detector condition and calibration (4.16), and incident investigation reports or lessons-learned bulletins (4.10).
- The planned maintenance system, which the questionnaire asks to be effective, up to date and followed on board (question 13.11).
- Lifting appliance records, including the thorough examination and load test (question 9.17).
Prepare for a RISQ Inspection, Stage 3: Rehearse the Demonstrations
Crew familiarity with a task and the ability to demonstrate it count as objective evidence, so some questions are answered by what officers can show on the day. The guide to question 3.1 gives an example: navigation officers should be aware of the actions required in the event of single or multiple ECDIS failures, which can be achieved through the ECDIS familiarisation checklist or routine drills, and inspectors should record a Finding if the bridge team are unfamiliar with the company’s contingency plans for ECDIS failures.
Question 3.2 works in a similar way. It asks whether the requirements of the Master’s standing orders have been explained to the deck officers, and whether bridge order books are being completed by the Master and countersigned by the officers.
Prepare for a RISQ Inspection, Stage 4: Walk the Ship Like the Inspector
Questions marked (V) in the RISQ are answered during the physical inspection. The areas the questionnaire covers include:
- Navigation: bridge logbooks, the radar performance book and the Change of Watch at Sea checklist (question 3.3).
- Lifting appliances: examination and load test records, wires, structure, machinery and loose gear (questions 9.17 to 9.22).
- Machinery space: sounding pipes and self-closing sounding devices (question 13.24) and the machinery listed in question 13.33, which includes the engine control console and steering gear system.
- Mooring: windlasses, anchors, locking bars and cables (question 10.18).
The inspector must also record any Finding on which action was taken to rectify it while on board.
On the Day
The inspector must be accompanied by a qualified and responsible officer. Any Finding must be pointed out and discussed at the time and place with the person accompanying the inspector, which RightShip says reduces the duration of the closing meeting. At the closing meeting the inspector must not advise on how to rectify a Finding or give any verbal indication of the overall result, and a copy of the list of Findings must be given to the Master.
After the Inspection: The Fifteen-Day Closeout
The vessel’s manager is required to provide a meaningful root cause analysis, with corrective actions and sustainable long-term preventative actions, for each finding within 15 days of the physical inspection of the vessel. The inspection cannot be completed until a satisfactory response has been received, and if none is received within 15 days the inspection is invalid. The quality of the vessel’s management system is evaluated by the quality of its replies to the findings, and the outcome is determined by the RightShip Dry inspections team.
Checklist to Prepare for a RISQ Inspection
- Inspection format confirmed (standard, hybrid or dual) and preparation time planned
- Documents complete and submitted at least 72 hours before boarding if the inspection is hybrid
- Master’s standing orders contain the required specific content
- ECDIS familiarisation evidence matches the equipment installed on board
- Officer matrix, rest hour records and working language verification accurate
- Electronic certificates valid, and the Master can demonstrate it
- Planned maintenance system effective, up to date and being followed
- Bridge team familiar with the company’s ECDIS failure contingency plans; standing orders explained to deck officers; bridge order books completed and countersigned
- Lifting appliances, machinery space items and mooring equipment checked against the questions listed above
- A qualified and responsible officer available to accompany the inspector
- Root cause analysis, corrective actions and preventative actions ready within 15 days of the physical inspection
RISQ Inspection Preparation: Frequently Asked Questions
How do you prepare for a RISQ inspection?
Confirm the inspection format, get the documents right, rehearse the demonstrations officers will be asked for, walk the ship against the areas the questionnaire covers, and have the closeout process ready, because the root cause analysis is due within fifteen days of the physical inspection.
How long does a RISQ inspection take on board?
It depends on the format. Under RISQ 3.2 a standard inspection is expected to take 10 to 12 hours, a hybrid inspection can be concluded in 8 to 10 hours if the documents are complete and submitted at least 72 hours in advance, and a dual inspection is designed to take 6 to 7 hours. These are net times and exclude interruptions.
How long do you have to close out RISQ findings?
The manager has 15 days from the physical inspection to provide a root cause analysis, corrective actions and sustainable long-term preventative actions for each finding. If a satisfactory response is not received in that time, the inspection is invalid.
Can the RISQ inspector advise on how to fix a finding?
No. Findings are recorded at the time and location they are found, and by the closing meeting the inspector is not permitted to advise on how to rectify them.
Sources
- RightShip, Inspection Ship Questionnaire (RISQ) 3.2, November 2025: type, scope and guide to timing of inspection; completion of the list of findings; electronic certificates; root cause analysis; closing meeting; questions 2.3, 2.5, 2.13, 2.14, 3.1 to 3.3, 4.3, 4.5, 4.7, 4.9, 4.10, 4.16, 9.17 to 9.22, 10.18, 13.11, 13.24 and 13.33
General information only. This article is not a RightShip publication and is not endorsed by RightShip.
More from the Vetting Series
→ Explore our Remote Assurance Service — See the Remote Assurance Audit
- RightShip Requirements for Dry Bulk Vessels: What Revision 4.0 Changes
- SIRE 2.0 Performance Influencing Factors: All 9, Explained One by One
- The STS Unit Questionnaire: What RightShip Actually Wants to Know About the Barge, Not the Ship
- What a RightShip RISQ Inspection Actually Tests — And Where Preparation Makes the Difference
- How the Vetting System Actually Works — SIRE, RightShip, PSC, and Why the Inspection Is Only Part of the Picture





