TMSA Emergency Preparedness: What Element 11 Stage 4 Actually Requires

Most companies have an emergency response plan. Element 11 asks whether it has been exercised out of hours, with alternates and external resources. What the sixteen Element 11 KPIs require, from plans to business continuity.

A TMSA emergency preparedness starts from the fact that a company without an emergency response plan is rare. The harder question is whether the plan has been exercised outside office hours, with the people named in it and with the communications links it depends on. Element 11, Emergency Preparedness and Contingency Planning, is about the shore side of an emergency: who answers the phone at three in the morning, who has the authority, and whether the company can keep managing the rest of the fleet while it deals with one ship.

Element 11 has sixteen key performance indicators: three at Stage 1, four at Stage 2, five at Stage 3 and four at Stage 4. This article goes through them in order and then looks at where the evidence tends to be thin. The wording is from OCIMF’s TMSA 3; the commentary is mine.

TMSA Emergency Preparedness at Stage 1: The Plans and the People

  • Vessel emergency response plans include initial notification procedures and cover all credible emergency scenarios (11.1.1). They are reviewed at least annually, to reflect changes in legislation, contact details, equipment and company procedures, and again after any incident or drill in which they were used.
  • A shore-based emergency response plan covers all credible scenarios (11.1.2), with effective notification procedures and communication links for rapidly alerting the emergency response team, and 24-hour cover that takes account of holidays and work-related travel. Exercises test all communication systems and mobilisation, including outside normal office hours.
  • Roles, responsibilities and record keeping are clearly defined (11.1.3), with the actions for each role, named individuals with alternates for key positions including the person with overall authority, and training for the designated roles.

The guidance on out-of-hours exercises in 11.1.2 and on alternates in 11.1.3 describe two common weak points. The person with overall authority is on leave, or on a flight, and the plan names only that person.

TMSA Emergency Preparedness at Stage 2: Facilities, Exercise Schedule, Media and Lessons

  • The company provides suitable emergency response facilities (11.2.1), which may be a dedicated room with dedicated phone lines, power outlets, computer workstations with network access, charts, whiteboards, television, back-up power and breakout rooms, reviewed regularly to take account of new technology.
  • The scope and frequency of drills and exercises follow the number and type of vessels and their trading patterns (11.2.2). An exercise schedule is used, scenarios vary in content and duration, security elements are included, and comprehensive vessel and shore exercises are carried out at least annually, supplemented by table-top exercises.
  • The plan includes procedures and resources to interact with the media (11.2.3): enquiries, press releases, monitoring of news and social media, TV and radio interviews, with media training appropriate to the role. External consultants may be used.
  • Lessons learnt from exercises and actual incidents are incorporated into the plans (11.2.4): recorded, areas for improvement identified, corrective actions and training implemented, exercises discussed at management review and the lessons circulated to fleet and shore staff.

In TMSA emergency preparedness, Stage 2 is where the plan is shown to be exercised, and the quality of the scenarios decides the value of the result. A drill that always begins with a fire in the engine room tests the same few people on the same few actions. The guidance asks for variety and duration, and for security elements, because real emergencies seldom arrive as the plan expects.

TMSA Emergency Preparedness at Stage 3: Participants, External Resources and Recovery

  • Records of participants in drills and exercises are kept (11.3.1). Everyone assigned a role takes part at regular intervals, designated alternates for key roles are included, and external resources and vessel personnel may be invited to take part.
  • Arrangements for external resources are in place (11.3.2), with contact details readily available for salvage and towage contractors, emergency response services, flag States and local authorities, charterers and cargo owners, hull and machinery insurers and P&I, media consultants, legal resources, manning agents where appropriate and logistics, including travel and procurement.
  • Exercises test the arrangements to call on external consultants and resources (11.3.3). External resources are mobilised at least annually, and communications links to them are checked regularly during exercises.
  • Business continuity in the event of disruption to the main place of business has been addressed (11.3.4): the company documents how it would maintain shore-based operations to ensure the safe management of the fleet.
  • Procedures address recovery following an incident (11.3.5), which may include an assessment of the ability of the ship and personnel to proceed on voyage safely, preservation of evidence such as CCTV records and VDR information, and engagement with external agencies such as the flag State, class, P&I, the Coast Guard and law enforcement.

In TMSA emergency preparedness, the two Stage 3 indicators on external resources are the ones that expose paper plans. A contact list that has never been dialled is a list of numbers that may not work. Recovery is the other easily forgotten step: preserving VDR data after an incident has to be decided in the first hours, before the recording is overwritten, and When VDR Data Works For You, Not Against You explains why.

TMSA Emergency Preparedness at Stage 4: Business Continuity, Major Exercises and a Long Response

  • A formal business continuity plan addresses events that could seriously disrupt the business (11.4.1), based on a risk-based assessment of credible scenarios, with notification procedures, remote working or alternative premises, remotely located IT facilities including back-up servers, and testing at regular intervals.
  • The company takes part in major emergency exercises involving external agencies (11.4.2), initiated by national or local authorities, the chartering company or the company itself, or facilitated by specialist crisis management consultants.
  • Means to support a protracted emergency response have been identified (11.4.3): managing fatigue of the response team, catering and hygiene, accommodation, safe transport, periodic review of the level of response and maintaining safe operation of the rest of the fleet.
  • Additional resources to support crisis management have been identified (11.4.4), such as family liaison officers, specialist post-trauma support and trained negotiators.

TMSA emergency preparedness at Stage 4 moves the question from the first hours to the first weeks. A plan written for an incident that lasts a day does not cover an incident that lasts a month, in which the same few people run the response and the rest of the fleet.

Where Other Standards Look at This

The ISM Code’s section 8 asks the company to identify potential emergency situations and establish procedures to respond to them (8.1), to establish programmes of drills and exercises (8.2), and to ensure its organisation can respond at any time to hazards, accidents and emergency situations involving its ships (8.3). SIRE 2.0 section 5.1, Emergency Response Plans and Drills, tests the ship side in questions such as 5.1.1 (familiarity with the emergency response plans and records of mandatory and company defined drills), and scenarios such as collision (5.1.8), grounding (5.1.9) and loss of propulsion (5.1.10).

The RightShip RISQ 3.2 questionnaire asks whether there is a schedule of drills and exercises to address potential emergency shipboard situations and whether it is being conducted effectively (question 4.9). DryBMS Subject Area 29, Emergency planning including crisis management, is one of DBCE’s seventeen priority areas. The ship-side drills feed the shore side. A steering drill that is timed, for example, as argued in The Emergency Steering Drill Needs a Stopwatch, gives the shore plan a response time to build on.

What a TMSA Emergency Preparedness Review Looks At

  • the shore plan, read for named alternates for every key role, including the person with overall authority, and for 24-hour cover;
  • the exercise schedule against the fleet’s size and trading pattern, with scenarios that vary and include security;
  • records of who took part, including alternates, and whether the last exercise ran outside office hours;
  • evidence that the external resources on the contact list were actually mobilised and the links checked;
  • the lessons-learnt record from the last exercise or incident, and the corrective actions closed;
  • the business continuity plan and the date it was last tested;
  • the management review record, showing whether an exercise result led to a change in the plan.

The gap between Stage 2 and Stage 4 in Element 11 is the difference between rehearsing the plan and rehearsing the company: its people on leave, its office unavailable and a response that runs for weeks.

Element 13 also expects contingency plans for breaches of security, covered in TMSA Maritime Security: What Element 13 Stage 4 Actually Requires.

Sources

  • OCIMF, Tanker Management and Self Assessment (TMSA 3), Element 11, Emergency Preparedness and Contingency Planning, KPIs 11.1.1 to 11.4.4
  • IMO, International Safety Management (ISM) Code, section 8 (Emergency preparedness)
  • OCIMF, SIRE 2.0 Question Library, section 5.1; RightShip, RISQ 3.2 questionnaire (November 2025), question 4.9
  • DBCE, DryBMS Subject Area 29 (Emergency planning including crisis management) and DBCE guidance v1.1 (priority subject areas)

General information only. This article is not an OCIMF publication and is not endorsed by OCIMF.

Updated 18 November 2026 to correct the RightShip RISQ question references, which now follow the numbering and wording of the RISQ 3.2 questionnaire (November 2025).


More from the HSEQ Series

→ Explore our HSEQ Outsourcing Service — Get HSEQ Outsourcing Support

Gaurav Khanna
Gaurav Khanna

Capt. Gaurav Khanna is the Founder and Director of Vraga Marine Services. He began his sea career in 1995 and spent 18 years working up from cadet to Master on product tankers and crude carriers across the Persian Gulf, North Sea, and Baltic trades. Coming ashore in 2013, he moved into fleet management with a Japanese ship management company, rising to Sr. Deputy General Manager and Branch Head with direct responsibility for fleet safety, vetting performance, and SMS compliance across a mixed tanker fleet. In 2021 he founded Vraga Marine to bridge the gap between compliance documentation and operational reality — combining VDR-based navigational auditing, SMS redesign, remote pre-inspection services, and physical inspections for ship managers across Asia, Europe, and the Middle East. He is formally qualified as a Lead Auditor, Navigation Assessor, and VDR Data Analyser, with additional certifications in crisis management, risk assessment, and management systems.

Articles: 104