Alarm management on ships is the question of what a watchkeeper can actually do with the alarms a ship produces. In 2024 Lloyd’s Register published a paper, Effective Alarm Management in the Maritime Industry, built on alarm recordings from ships’ bridges and engine control rooms and on a survey of 65 watchkeepers on 15 ships managed by 10 companies. Its conclusion is blunt: the alarm problem is systemic, and it appears even on the ships chosen as the best of the best.
This article summarises what the paper found and what it means for a ship manager. The numbers are Lloyd’s Register’s, from its own recordings and survey, and they come from a sample in which some ship segments are more heavily represented than others, so they show what is possible and common, not an average for every fleet. The comments on what to do about it are mine.
Alarm Management on Ships: What Lloyd’s Register Measured
The research into alarm management on ships had three parts. For the bridge, the authors made manual recordings of every alarm annunciated, because many bridge systems are only partly integrated and a single log does not exist. Two recordings were made on two technical sister passenger ships on similar routes, and a third on the first ship through the Strait of Gibraltar at night. For the engine control room, they took alarm and event logs from the integrated automation system, which can usually be extracted as CSV files. Finally, they surveyed 65 watchkeepers with 26 questions about their own experience of shipboard alarms.
Alarm Management on Ships: What the Recordings Showed
| Where | What was recorded |
|---|---|
| Bridge, open sea | 9.5 alarms an hour on average across the two sister ships |
| Bridge, coastal waters | 18.3 alarms an hour |
| Bridge, confined waters | 27.9 alarms an hour |
| Bridge, Strait of Gibraltar at night | 163 alarms in the recording, above one a minute (74 an hour) |
| Engine control room, one recording | 728 alarms, with a peak of 111 an hour |
| Engine control room, one ship over about a year | Approximately 2,500 machinery alarms a day |
On the bridge the highest alarm rates came at departure, arrival and traffic separations, which are the moments when the navigating officers need to be most focused. The two sister ships, on near-identical routes and distances, produced 352 and 105 alarms. Lloyd’s Register’s explanation is partly the ports, but it also noticed that the first ship used the company’s standard ECDIS and radar settings and the second sailed with the master’s own, far more relaxed ones, a pattern it saw on several other ships.
In the engine control room the authors describe the alarm system on most larger passenger ships as constantly in an alarm flood, with one case peaking at approximately 22,500 machinery alarms on a single day. On the first ship only one engineering watchkeeper used the alarm list screen, and nobody used it on the sister vessel, although six large monitoring displays were available. Watchkeepers preferred the process mimics instead.
Alarm Management on Ships: What the Watchkeepers Said
- On average, fewer than a third of the ten most typical alarms were said to need a positive action: 32.2% in the engine control room and 32% on the bridge. Lloyd’s Register reads this as a missing rationalisation step: alarms that probably should never have been alarms.
- In a large fault, trip or demanding operation, only about 25% of officers said alarms never or rarely come in too fast to take in.
- More than 60% of bridge officers said 40% or more of their alarms were repeats of an alarm already seen in the last five minutes.
- About 58% of engineering officers said two or more alarms for the same item often or sometimes occurred together, and about 52% reported nuisance alarms for machinery that was already shut down.
- Muting was common. The paper records officers taking turns to sit and mute alarms, acknowledging afterwards, and in the worst case, 70 safety alarms manually suppressed on one visited ship.
- Only one of the 15 ships used advanced alarm techniques in its central alarm system so that only critical alarms were presented in a blackout, and the engineers on that ship found it immensely helpful.
The paper adds that most watchkeepers (about 71%) said they felt comfortable with alarms they had already met, but that this knowledge largely covers alarms they have personally experienced. With thousands of alarms and few written procedures, Lloyd’s Register says it is unrealistic to expect a watchkeeper to know what to do about each one, and ships with high turnover among officers look especially exposed.
The Incidents the Paper Draws On
Lloyd’s Register’s argument rests on incidents where the alarm system itself was part of the story. As the paper reports them from the investigation reports:
- Viking Sky. The crew had accepted and cleared 18 low lubricating oil alarms in four hours before the blackout. Non-cancellable shutdowns on the diesel generators then caused a loss of all propulsion, and about 1,000 alarms sounded in the first 10 seconds. It took 39 minutes to diagnose the cause and restore power, with the ship within about a ship’s length of grounding. The Norwegian Safety Investigation Authority recommended that an engine room alarm management performance standard be developed at IMO.
- Stena Scandica. After a fire, the crew did not notice the loss of power from the emergency switchboard for about 45 minutes because the alarm monitoring system was flooded.
- RMS Queen Mary 2. The MAIB found that alarms at around one a minute on the integrated automation system were most likely to have overwhelmed the watchkeeper, and that the propulsion motor alarms were not acted on.
- Damgracht and AP Revelin, and Maersk Eindhoven. In both, a false alarm and the associated shutdown of the main engine led to a collision and to a loss of manoeuvrability in heavy weather.
Alarm Management on Ships: What the Rules Say, and What They Leave Out
Lloyd’s Register points out that the IMO Code on Alerts and Indicators, last issued in 2009, divides alerts into four priorities (emergency alarms, alarms, warnings and cautions) and contains only two high-level clauses on nuisance and the number of alerts, and that the clause on minimising alerts is reserved for the navigation bridge.
It says no IMO, flag State or class requirement imposes a minimisation process or objective criteria such as allowable response time or a maximum alarm rate per watchkeeping officer, and that IEC 62682 on the process industries, with its lifecycle from philosophy and rationalisation to monitoring and audit, is the model that adjacent industries use. It also says a response time of around ten minutes is typically agreed in an alarm philosophy, with values under five minutes rarely surviving rationalisation.
There is movement on alarm management on ships in the engine room. DNV’s summary of the IMO Sub-Committee on Ship Design and Construction, which met in January 2026, says the sub-committee agreed a draft outline for performance standards on engine control room alert management, with a road map and a correspondence group to work until SDC 13 in 2027, and a road map date of 2028 for finalisation.
Lloyd’s Register’s own account of the session says the work was raised in part by the Norwegian Maritime Authority after the Viking Sky investigation. Both describe the work as under way, and DNV notes that the sub-committee’s decisions are subject to the Maritime Safety Committee. I have not read the SDC 12 report itself, so treat the dates as indicative.
What a Ship Manager Can Do About Alarm Management on Ships
None of this needs a new standard. It needs someone to look at the alarm record the ship already has. These are the steps I would suggest:
- Count the alarms. Ask for a week of the engine control room alarm log as a CSV file and count the alarms per hour, split by the hours around arrival and departure and the rest. Do the same for the bridge during one arrival. Lloyd’s Register’s rates are a yardstick.
- Ask what each of the top ten alarms is for. If the answer is “nothing, we acknowledge it”, it is a candidate for rationalisation, with the class society and the equipment maker.
- Keep a list of suppressed and muted alarms, with who authorised each and why. A safety alarm that a crew has silenced because it distracts is a finding waiting to be written.
- Control changes to alarm settings. Where alarm limits and bridge settings can be changed by the watch, the SMS should say who may change them and how the change is recorded. A master’s preferred settings, as in the paper’s second ship, are a decision of the master, and SOLAS Chapter V, Regulation 34-1 leaves no doubt about that authority, but the company should know that the settings are different.
- Rehearse the flood. A blackout drill that includes the alarm list, not just the restart sequence, shows whether the engineers can find the one alarm that matters among the rest. It parallels the argument I made about steering in The Emergency Steering Drill Needs a Stopwatch: time it.
- Treat turnover as a risk. New officers know the alarms they have met. Ship-specific familiarisation should include the alarms they have not.
The same reasoning applies to alarm management on ships on the bridge. ECDIS in Tidal Ports describes an alarm that stops working when it matters most, and the Ship Safety Management System guide sets out why a procedure that exists is not the same as one that is usable at the moment it is needed.
Sources
- Lloyd’s Register, Effective Alarm Management in the Maritime Industry, 2024 (a summary of the LR Digital Transformation Research Programme report Alarm Management in the Maritime Industry, Volume 1); incident details are as quoted in that paper from the DMAIB, NSIA, MAIB and NTSB reports
- IMO, SOLAS 1974 as amended, Chapter V, Regulation 34-1 (Master’s discretion), consolidated edition
- DNV, IMO Sub-Committee on Ship Design and Construction (SDC 12), 26 January 2026
- Lloyd’s Register Horizons, From research to regulation: alarm management reaches the IMO, April 2026
- IMO, Code on Alerts and Indicators, 2009 (as described in the LR paper); IEC 62682, Management of alarm systems for the process industries (as described in the LR paper)
More from the HSEQ Series
→ Explore our HSEQ Outsourcing Service — Get HSEQ Outsourcing Support
- DryBMS Scoring: The Two Gates That Decide a Self-Assessment
- TMSA Maritime Security: What Element 13 Stage 4 Actually Requires
- TMSA Environmental Management: What Element 10 Stage 4 Actually Requires
- TMSA Seafarer Welfare, Manning and Rest Hours: What Element 3A Stage 4 Actually Requires
- TMSA Vessel Personnel: What Element 3 Stage 4 Actually Requires
- TMSA Shore-Based Personnel: What Element 2 Stage 4 Actually Requires
- TMSA Leadership and Accountability: What Elements 1 and 1A Actually Require
- How to Plan a TMSA Audit: Four Phases From Gap Analysis to Submission
- TMSA Emergency Preparedness: What Element 11 Stage 4 Actually Requires
- TMSA Management of Change: What Element 7 Stage 4 Actually Requires
- The TMSA Incident Investigation Audit: What Element 8 Stage 4 Actually Requires
- The DryBMS Cyber Security Standard: What Excellence Actually Requires
- TMSA Compliance: A Practical Guide to All 13 Elements, and Where DryBMS Fits
- The DryBMS Audit Planning and Close Out Standard: What Excellence Actually Requires
- The DryBMS Engine Room and Bunkering Standard: What Excellence Actually Requires
- The DryBMS Risk Assessment Standard: What Excellence Actually Requires
- The DryBMS Mooring and Anchoring Standard: What Excellence Actually Requires
- The DryBMS Cargo and Ballast Standard: What Excellence Actually Requires
- TMSA Self Assessment: Declare What You Can Sustain, Not What You Aspire To
- The Audit Is Closed. The Problem Isn’t.





