Voyage Planning in Navigation Corridors: What AMSA Marine Notice 2024/09 Expects of the Bridge

AMSA Marine Notice 2024/09 on planning and executing a voyage within ECDIS navigation corridors: XTD/XTL, the safety margin, leaving the corridor and the two grounds on which a PSC officer may cite a deficiency.

Voyage planning in navigation corridors is the subject of AMSA Marine Notice 2024/09, last updated on 10 January 2025. Its purpose is to ensure that navigation corridors are used appropriately when planning on ECDIS, and that a voyage plan approved by the Master is executed within the planned corridor so far as is reasonably practicable. It is addressed to ship operators, Masters, officers of the watch, recognised organisations and flag States, and it names two things an Australian port State control officer may treat as a deficiency: unreasonable and systemic use of the safety margin outside the planned corridor, and no consideration of how cross track distances change between confined and open waters.

This article summarises the notice on voyage planning in navigation corridors from AMSA’s published text. Voyage planning requirements that give effect to SOLAS are established in Australian law by Marine Order 27.

How the Notice Describes Voyage Planning in Navigation Corridors

The notice starts from IMO Resolution A.893(21), which treats voyage and passage planning as appraisal, detailed planning from berth to berth including pilotage areas, execution of the plan and monitoring of progress. Having made a full appraisal, the passage plan is plotted on the ECDIS together with the intended cross track distance or limit (XTD/XTL) for each leg, berth to berth. That determines the planned navigational corridor for each leg, which is then checked electronically for charted hazards with the route check function. Dangers found can be considered and the plan amended before the Master’s final approval and the start of the voyage.

AMSA says the point of staying within the corridor during execution is to minimise workload: the corridor readily shows pre-checked waters where the ship can safely navigate.

The Safety Contour and the Safety Margin

The safety contour, set at the safety depth, defines a generally no-go area where the ship may be in imminent danger and should avoid where possible. The notice points out that the ECDIS uses the closest chart contour that is at least as deep as the setting entered: if the chart has contours at 10 m and 15 m and the safety contour is set at 11 m, the safety contour shown will be the 15 m contour. Soundings equal to or shallower than the safety depth are shown in black and must always be avoided, while deeper soundings are grey.

The area outside the planned corridor, up to the no-go area, is treated as a safety margin for unplanned or unforeseen circumstances. The width of corridor and safety margin is to be balanced leg by leg, taking into account GNSS accuracy, the vessel’s characteristics, the zone of confidence of the electronic navigational chart and expected traffic conditions.

Leaving the Corridor

The voyage is expected to be executed in accordance with the plan and monitored to stay within the planned corridor so far as is reasonably practicable, and any departure from the approved plan is to be carefully considered. The notice calls the safety margin an area that has not been electronically verified, pre-checked or approved by the Master, so departing into it needs additional caution to keep situational awareness. When the margin has to be used immediately, the bridge team should make a visual check and assessment of the ECDIS and agree a plan to deviate and return as soon as the circumstances allow, with the ECDIS look-ahead functions becoming paramount. If a non-urgent deviation is identified, the Master is consulted and the voyage plan amended before the ship leaves the corridor. Recording the reasons for departing from the approved plan will aid verification of sound navigation practice.

AMSA recognises that reasonable use of the safety margin is needed, and says that unreasonable and systematic use of it may indicate the need to reassess voyage planning practices.

What a Port State Control Officer May Cite

A deficiency may be considered where an Australian officer finds unreasonable and systemic use of the safety margins outside the planned navigation corridor, or finds that no consideration was given in voyage planning to the variation in XTD/XTL between confined and open waters. The IMO references the notice lists are A.893(21), the ECDIS performance standards MSC.232(82) and MSC.530(106), and MSC.1/Circ.1503/Rev.2 on ECDIS good practice. The changeover between those performance standards is covered in ECDIS Performance Standards 2026: What MSC.530(106)/Rev.1 Actually Changes. For what the bridge data shows about planning in practice, see Passage Planning Mistakes Ships Make, and What the VDR Reveals, and for the safety contour alarm in tidal waters, ECDIS in Tidal Ports.

This article is part of the Port State Control guide, which maps the port state control articles on this site by the question a ship manager asks.

Sources


More from the PSC Series

Gaurav Khanna
Gaurav Khanna

Capt. Gaurav Khanna is the Founder and Director of Vraga Marine Services. He began his sea career in 1995 and spent 18 years working up from cadet to Master on product tankers and crude carriers across the Persian Gulf, North Sea, and Baltic trades. Coming ashore in 2013, he moved into fleet management with a Japanese ship management company, rising to Sr. Deputy General Manager and Branch Head with direct responsibility for fleet safety, vetting performance, and SMS compliance across a mixed tanker fleet. In 2021 he founded Vraga Marine to bridge the gap between compliance documentation and operational reality — combining VDR-based navigational auditing, SMS redesign, remote pre-inspection services, and physical inspections for ship managers across Asia, Europe, and the Middle East. He is formally qualified as a Lead Auditor, Navigation Assessor, and VDR Data Analyser, with additional certifications in crisis management, risk assessment, and management systems.